Tenure of land |
Freehold |
Road |
40 meter wide main road and 30 meter wide secondary road |
Electricity |
115/22kv |
Water Supply |
7 cubic meters per day for every plot of 1,600 square meters of land |
Waste Water |
Waste water treatment plant is situated within the estate. Current waste water treatment capacity of 4,000 cubic meters per day that can be increased to accomodate greater demand. |
Flood Control System |
Rain water drainage system and 10 automatic vertical pumps. |
Fire Prevention System |
Installed Fire Hydrant at every 75 metres interval. A fire brigade station with fire
vehicles and Haz Mat equipment |
Security and Sanitation |
Provided by Property Care Services Company Limited (PCS) for daily cleaning, up-keep
and manning of the 24 hour security system. |
Telephone access |
5,000 telephone lines available by TOT Public Co., Ltd. |
Internet Access |
Hi-Speed internet and voice over IP by True Corporation Public Co., Ltd. |